top of page

2025

During the academic year, the 2025 Team prepared the design and construction of a suspended footbridge across the Río Papa Chacra, in Papa Chacra, Tarija, Bolivia. The Team traveled in June and July of 2025, and completed the construction on time. The bridge is 47.60 meters long (156.17 feet) and now serves 300 individuals from surrounding communities. It also provides safe access to farming lands, 2 schools, and a hospital. Before construction, during 180 days of the year, the river was difficult or impossible to cross due to flooding.

Location

Papa Chacra, Bolivia

Community Members Served

300

Bridge Span Length

47.6 m

Meet the Team

Our Best Pictures

NDSEED Logo white transparent_edited.png

Notre Dame Students Empowering through Engineering Development (NDSEED) was formed in 2008 when six civil engineering students decided to combine their academic interests with their passion for service in support of their university’s mission. Today, their vision still lives on: NDSEED has worked on 13 bridges in 5 countries under the leadership of 124 Notre Dame students.

ND_mark_white_M.png

Copyright © 2019 University of Notre Dame

NDSEED 156 Fitzpatrick Hall

Notre Dame, IN 46556

Follow us

  • Facebook
  • LinkedIn
  • Instagram
  • Youtube

Email

bottom of page